The agreements that secure your project
A bankable structure backed by sovereign support. After the 2025 reform, electricity purchase (Uzenergosotish) and transmission (NEGU, via a TCA) are contracted separately; large projects sign a package: IA + PPA + GSA + TCA.
NDA
Non-Disclosure Agreement
Signed before any project data is shared — protects both parties’ information. Every engagement starts here.
Agency
Agency Agreement
Between the investor and CAPPA — the only document on this list not signed with the state. It sets the scope of the mandate, territory and exclusivity, the success fee and the reporting regime. Signed immediately after the NDA and before any work begins.
IA
Investment Agreement
Between the Government (Ministry of Investment, Industry & Trade) and the foreign investor. Locks in guarantees, tax incentives, investment volume (e.g. building solar/wind of hundreds of MW), land allocation and return-of-investment terms.
PPA
Power Purchase Agreement
25-year offtake of the full output at a fixed tariff in foreign currency. After the 2025 reform it is signed with the offtaker, Uzenergosotish.
GSA
Government Support Agreement
Sovereign support from the Ministry of Economy & Finance — liquidity and termination payments backing the offtaker’s obligations.
TCA
Transmission Connection Agreement
Grid connection and transmission services with the National Electric Grid (NEGU). Contracted separately from the PPA after the 2025 reform.
PPP
Public-Private Partnership
PPP structures (concession, BOOT, etc.) — the main route for most renewable tenders, with the strongest packaged government support.
EPC/EPCM
EPC & EPCM Contracts
The core contracts for design, equipment procurement and construction of the power plant (Engineering, Procurement, Construction / Management).
BSSA
Battery Storage Service Agreement
A separate storage-services (BESS) agreement: accumulate surplus green energy at peak generation and release it back to the grid.
Retail
Electricity Supply Contracts
Retail offtake contracts between regional distribution companies (e.g. JSC “Regional Electric Networks”) and consumers or industrial enterprises.